Border Environment Cooperation Commission
Wastewater
System Improvements in Mexicali, Baja California
1.
Type
of Project.
The Mexicali
Wastewater Collection and Treatment Project falls within BECC priorities, since
its intention is to improve the city's environmental situation by providing it
with an outfall, a lift station, and a wastewater treatment plant.
2. Location of Project.
The City of Mexicali, capital of the State of Baja California, is located
in the State's north-central area. To the north, the city borders with
Calexico, California. Mexicali is located in a primarily dessert area. Its
population is approximately 765,000. The project applicant is the Comisión
Estatal de Servicios Públicos de Mexicali (Mexicali's State Commission for
Utility Operation or CESPM.) The following figure shows the project location:
3. Description of Project and Tasks.
In December 1997 the BECC certified a
"Wastewater Collection and Treatment Project for Mexicali, B.C." with
a cost of US $50.395 million, to benefit a population of 60,0000 residents. The
project consisted of 41 tasks intended to upgrade part of Mexicali's wastewater
collection and treatment infrastructure, such as the rehabilitation and
expansion of the Mexicali I Wastewater Treatment Plant (WWTP), as well as the
introduction of wastewater collection to over 46 subdivisions that lacked this
service. The project required the construction of Lift Station No. 4 and the
Mexicali II WWTP (first phase) to treat wastewater from the city's northeastern
area.
This certification allowed the applicant, CESPM, to
obtain in 1998 funding from the North American Development Bank (NADB) to build
the aforesaid infrastructure.
CESPM has been using the above funds to build
various structures, such as Lift Station 4, which would convey raw wastewater
through an outfall to the Mexicali II WWTP located in El Choropo. Due to
opposition faced for the construction of such facility by ejidatarios (farmers,
holders of communal land tracts) in El Choropo, CESPM started reviewing other
alternatives. One of such alternatives, which presents several advantages, as
will be later described, places the facility at a site called Las Arenitas.
This is one of the alternatives previously reviewed.
In order to grant CESPM the funds considered by NADB
for the construction of the Mexicali II WWTP, the BECC needs to accept and
certify the new location, along with other project tasks, since the
certification of the wastewater collection and treatment program considered a project
to which CESPM is proposing to make relatively significant modifications. This
issue had to be presented to the BECC Board of Directors to consider the
possibility of re-certifying the Wastewater Collection and Treatment Program.
Mexicali II WWTP, Las Arenitas
The site where the facility is intended to be
located, known as Las Arenitas, is located 26 km south of Lift Station 4 (see
Figure), in an entirely uninhabited area that neighbors Cerro Prieto. Treatment
capacity in Las Arenitas WWTP will be 880 l/s. The effluent from the WWTP will
be discharged to a drain that flows north to south towards the Gulf of
California (Hardy River).
Regarding the certified project, this alternative
comprises the adjustment of LS4 or the construction of a new lift station
adjacent to El Choropo area, as well as a 16 km-long outfall from this site to
the facility at Las Arenitas.
Following are the benefits and drawbacks of the new
proposed site.
Benefits
· Located
outside of the urban zone, in an unpopulated area close to Cerro Prieto.
· Neither
this land nor any of the adjacent lots are currently being used.
· Land is
available for sludge processing.
· Treated
water will finally reach the Gulf of California, thus it will not cross into
the U.S., and may be reused.
· Opposition
by some of the residents will be addressed; in fact this was a proposal
presented by the ejidatarios.
Drawbacks
· This
option that requires more funds than the original proposal.
· The
facility will be away from the city, and thus its operation will be more
complicated.
· The lot
has to be enhanced to prevent infiltration, since it is comprised of sandy
soil.
4. Conformance
with International Treaties and Agreements
The project conforms to existing treaties and
agreements. The project falls within the International Boundary and Water
Commission Minute 294. The purpose of the project is to provide a solution to
the sanitation problems of the New River in order to comply with the standards
established by the California Regional Water Quality Board. Also, a Binational
Technical Committee was formed to guide the project during the planning stages.
1. Human Health/Environmental Needs.
At present, the City of Mexicali does not
have sufficient capacity to treat all the wastewater generated by its
residents. Flows from the area known as Mexicali I are conveyed to the Zaragoza
lagoons. However, wastewater from in Mexicali II is discharged to a drain that
flows into the Rio Nuevo.
The Las Arenitas WWTP, along with the new and
available lift station and the proposed outfall, will solve Mexicali's
wastewater treatment issues. Additionally, it will reduce the amount of
nutrients that flow into the Rio Nuevo and eventually reach the Salton Sea.
The effluent from Las Arenitas WWTP will meet
the standards of NOM-001-ECOL-1996.
2. Environmental Assessment.
An Environmental Impact Document (Manifestación de Impacto Ambiental, MIA) was prepared for the project. The MIA was submitted to the SEMARNAT for a finding. The Bureau's finding is expected to be available by early September 2003. The MIA did not identify any significant environmental impacts as a result of the construction and operation of the proposed project.
In addition, an Environmental Impact Study was prepared to comply with the U.S. National Environmental Protection Act (NEPA). The study reviewed the project's impact to the United States, and specifically impacts to the Rio Nuevo and the Salton Sea. The study also discussed impacts related primarily to the reduced amount of water that will flow into the Salton Sea as a result of conveying flows from Mexicali II to the Las Arenitas facility. The annual reduction will range between 15 and 20 cm, until the Salton Sea reaches a balance point three years later.
Furthermore, a significant benefit is expected for the Rio Nuevo and the Salton Sea with the reduction of BOD5, TSS, and phosphates. The reduction in the amount of these contaminants is expected to be 43, 65 and 25 percent, respectively.
The environmental study also discusses the project's cumulative impacts, including the impact of the transfer of irrigation water to the City of San Diego, and the impact that the discharge from Mexicali's power plants will have.
3. Compliance with Ecology and Cultural Laws
and Regulations.
The project complies with
applicable laws and regulations that govern environmental and cultural
resources. As described in Section II, environmental review processes were
conducted both in the United States and in Mexico. Applicable agencies were
consulted for the protection of cultural resources and endemic species.
1.
Appropriate
Technology.
The project proposes
the construction of a wastewater treatment plant at a site known as Las
Arenitas. A preliminary plan is available for the facility, since its design
and construction will conform to a turnkey scheme, in which the contractor
designs, builds and operates the facility during the first year.
Additionally, CESPM
started the construction of a 48-inch wide outfall, from Lift Station No. 4 to
El Choropo site. The outfall will run 8.9 km long. CESPM will also install 16
kms of outfall from El Choropo to the Las Arenitas facility. Pipes for the
outfall are made of K-7 ductile cast iron that meets ISO 2531 specifications.
The last component to
be installed will be a lift station at El Choropo site. The lift station will
be furnished with Cornell 18NGH-VC20TB vertical pump for 535 lps with a 27.89
total dynamic load.
In addition, pumping equipment will also be purchased to divert flows during emergency events in the city's mains and sewers. The equipment is being evaluated for purchase, along with the number of units and equipment sizing.
2. Operation and
Maintenance
CESPM has various operation and maintenance manuals, since it currently
operates lift stations, pressure outfalls, and several wastewater treatment
facilities. In addition, the design, construction and one-year operation of Las
Arenitas facility will be subject to a bidding process. As part of the proposal
review process, the companies' operation and maintenance capacity and
experience will be considered.
Purchasing emergency pumping equipment will help CESPM prevent untreated
wastewater discharges to the drains that flow into the Rio Nuevo. Pumping
equipment will enable the utility to divert wastewater from one inspection well
to a downstream inspection well when repairs need to be made to mains and
sewers.
3.
Compliance with applicable design norms and regulations.
CESPM
has developed final designs for the lift stations and the Lift Station 4
outfall to Las Arenitas. Final designs meet the standards established by the
[Mexican] National Water Commission. In addition, the company selected to
prepare the design and build Las Arenitas WWTP will have to conform to standard
engineering guidelines as well as those established by regulating agencies.
1.
Financial
Feasibility.
A financial
study was developed to determine the utility's debt capacity. The study
recommended that the utility increase its revenue to cover the proposed
infrastructure's operation and maintenance costs. CESPM is increasing its
revenues by making an effort to collect delinquent account balances and above
all, by reducing water losses in the system, which enables the utility to have
more water available for sale.
The following
table shows the costs of the proposed tasks. It must be noted that costs
include 8 percent for supervision and 10 percent for contingencies.
Additionally, the first phase of the outfall is under construction and the
piping used was purchased by EPA as part of the project certified by BECC in
1997. The cost of the pipes for the outfall's first phase has not been included
in the project's total cost.
Item |
Cost |
Outfall (1st
phase) |
13,565,405.97 |
Outfall (2nd
phase) |
111,195,594.02 |
Lift Station |
40,500,189.27 |
Las Arenitas
WWTP |
125,974,826.65 |
TOTAL |
291,236,015.91 |
Project funding sources are presented in the
following table. It must be mentioned that CESPM's contribution is intended to
match funds provided by EPA's Border Environmental Infrastructure Fund (BEIF).
CNA's contribution will be matched by EPA in a future project.
Funding
Source |
Amount |
EPA |
82,630,594.63 |
CESPM |
82,630,594.63 |
CNA |
62,987,413.32 |
Japanese Loan |
62,987,413.32 |
TOTAL |
291,236,015.91 |
As mentioned
before, this project will not require user fee increases, since CESPM increased
its fees by 14 percent in November 2002 and anticipates annual 7 percent
increases in 2003 and 2004. This increase, along with higher revenues by CESPM,
will make possible the operation and maintenance of the proposed
infrastructure.
1. Comprehensive Public Participation Plan.
The public process
formally started on December 16, 2002, when Mr. Efraín Muñoz Martín, General
Director of the Comisión Estatal de Servicios Públicos Municipales de Mexicali
(CESPM), acting as project applicant, was provided with the BECC's Guidelines
for Community Participation and other reference documents to initiate the
public process.
The applicant, based
on previous work meetings attended by distinguished community representatives
who later joined the Steering Committee, submitted a Comprehensive Community
Participation Plan to the BECC for review. The plan was received on March 21,
2003 and was approved by BECC on March 26, 2003.
2. Steering Committee
The
Steering Committee was established on March 18, 2003 at a meeting held at
CESPM's Meeting Room in Mexicali, BC and attended by 31 representatives of
local organizations, labor unions, professional associations, academic
institutions, neighbor associations, service clubs, business representatives,
public officials, etc. This ensured an expanded, plural and inclusive Steering
Committee with a clear idea of the most important currents of opinion in the
community. The Steering Committee's Board was selected as follows: Rogelio
Blanco Jester, Chairman; Jose Juan Sanchez Soler, Secretary; Francisco Mosqueda
Martinez, Ricardo Valenzuela Stevenson, Rene X. Acuña, Roy Blanco Cordero and
Armando Aranda Miranda as alternates.
3. Local Organizations
The
project sponsor and the steering committee contacted several organizations,
including the Chambers of Commerce and Industry, as well as several
environmental groups in the area.
4. Public Information
The
Steering Committee and the applicant held meetings with local organizations and
presented the project before chambers, associations and neighbor organizations.
A highlight was the information meeting held on July 10, 2003 with the
Asociación Ecológica de Usuarios del Río Hardy-Colorado A.C. [Ecological Association
of Users of the Hardy-Colorado River] as well as a meeting with representatives
of the Cucapah Indian Tribe, who were explained the project's technical
characteristics and environmental benefits.
5. Public Meetings
First Public Meeting: This meeting was held on the
afternoon of April 29, 2003 at the National Chamber of Commerce (CANACO) Hall
in Mexicali, and had approximately 65 attendees. At this meeting the project's
technical scope and proposed site were presented, along with the issue being addressed
and the project's approximate cost. The participation of attendees, by its
intensity and determination, ratified the community's concern to address the
issue. An exit poll as given to 57 attendees, and 98% of those surveyed
explicitly expressed their support for the project.
Second Public Meeting:
This meeting was held on the afternoon of Thursday, July 17, 2003 and,
as well as the previous meeting, it took place at the National Chamber of
Commerce (CANACO) Hall in Mexicali. The meeting had 123 people in attendance.
The project defined as the "Cleanup Program for the
Rio Nuevo in Mexicali, BC" includes as an important component the
construction of a wastewater treatment plant to be located in an area known as
"Las Arenitas," in the City of Mexicali. However, this facility, as
part of another project, was intended to be located in the area known as
"El Choropo" in the same city. However, the community's concern and
particularly the opposition of "El Choropo" residents to the facility
being built near their houses was such, that the BECC, reflecting its
willingness to listen to the voice of a community that presented legitimate and
applicable arguments, resolved to redefine the project and identify a new
location.
All the above becomes relevant when community leaders from
"El Choropo" showed up at this second meeting to express their total
support for the "Las Arenitas" project and to voice that, if in the
past they vigorously opposed the project that proposed a wastewater treatment
facility at "El Choropo," they now came to make justice to the BECC
and recognize its willingness to listen to residents with an open, plural and
conciliatory spirit.
Just as in the first meeting, the project's technical
scope, location, issues addressed and approximate costs were presented at this
meeting. Additionally, emphasis was made in also presenting user fee increases
required by the project.
After a very rich question and answer session where an opportunity was given to stakeholders to freely express themselves, 97 surveys were applied, and 100% of those surveyed explicitly expressed support for the project.
1.
Definition and Principles
The
basic principle for sustainable development considered by BECC is: Conservation
oriented social and economic development that emphasizes the protection and
sustainable use of resources, while addressing both current and future needs,
and present and future impacts of human actions. The Mexicali Wastewater System
Improvements Project includes among its objectives to expand the wastewater
treatment capacity. The project plans to provide this service to the entire
population during a 12-year project horizon. The city does not have treatment
capacity of the total wastewater generated and this situation impacts the
environment negatively.
Overall, the proposed project will promote significant environment and
natural resource conservation benefits, inasmuch as the following feasible
objectives have been established:
·
Treat wastewater
generated by city residents.
·
Reduction of
organic load and nutrients contribution to the New River bi-national watershed,
therefore, to the Salton Sea.
·
Gradually but
significantly reduce raw water infiltration to the ground.
This project intends to provide 100% wastewater treatment coverage by
the end of the performance period, substantially improving the overall life
conditions for residents who currently lack this service.
In
view of the above considerations, it is possible to establish that this project
conforms to BECC's sustainability principles.
2. Institutional and Capacity Building
As
part of the Mexicali Wastewater System Improvements Project the applicant has
identified activities and actions in addition to the construction of
infrastructure to enhance CESPMs institutional capacity.
·
CESPM has
developed a water conservation campaign that will be reinforced during the
following years to create public awareness as to the importance of saving and
making rational use of water.
·
Infrastructure
growth will clearly demand greater technical capabilities in CESPM to
efficiently operate the system. Hence, the project has considered a staff
training program to operate the system in a more efficient manner. An option
that has been considered for training is one offered by NADB through the
Utility Management Institute (UMI). The above will be incorporated into a
comprehensive human resource development program.
·
A quality
assurance and control program will be establish with the purpose of creating
quality criteria to operate the system under applicable quality procedures and
policies, as well as to establish criteria and standards for the design and
construction of new infrastructure.
·
Analyses of the
legal framework have been made to determine the actions targeted to carry out
the necessary legal adjustments for CESPM's institutional capacity building.
·
Currently, the
NADB develops Financial and Institutional Strengthening programs in CESPM,
evaluating administrative and financial performance indicators over time, and
measuring their results.
·
Among these
programs it is included the development of a study to evaluate the tariff
structure and create a tool with which CESPM may implement service charges
appropriate to the financial conditions to operate, maintain and increase the
infrastructure, avoiding the risk of facing an infrastructure backlog in the
future.
·
An important
point that must be highlighted is the infrastructure's maintenance and
preservation. The project proposes the development of two types of maintenance
programs for the facility: preventive and corrective maintenance.
·
Additionally, the
training will include a contingency program for the system's construction,
start-up and operation phases, which will be provided in writing to all the
staff directly or indirectly involved in these activities. A safety program
will also be implemented and reinforced by the provision of an appropriate
number of quality equipment. The safety program will include enforcement of
construction specifications, in addition to general procedures for operating
the equipment and facilities that conform the systems, including electrical
installations. Also, back-up pumping equipment is included in the projects
scope, in order to guarantee continuous operation of the pumping station, even
if preventive or corrective maintenance had to be done in the main pumps.
The
construction of the Las Arenitas Wastewater Treatment Plant, a 16 km outfall,
and the PB4 improvements or the construction of a new one, will improve
significantly CESPMs wastewater conveyance and treatment capacity, helping to
abate the lack of wastewater treatment that remained with the Choropo Plant
project cancellation.
3.
Conformance with Applicable Local and Regional Conservation and Development
Plans
The
Mexicali Wastewater System Improvements Project complies with BECC requirements
and is based on the strategic guidelines provided in the Municipal Urban
Development Plan and on regional conservation regulations and criteria, which
main objective is to improve the quality of life of Mexicali residents within a
framework of harmonious and balanced integration by planning urban development
and land management. Such policies and guidelines relate to three fundamental
issues: growth, conservation, and improvement.
The Mexicali Project complies entirely with the city's urban development
planning strategies, both for its current needs as well as for future needs
projected, and largely contributes to achieving the objectives of improving the
quality of life of city residents, inasmuch as the project proposes tasks
considered to be urgent to reduce the current backlog and improve the
conditions for people who already reside in the city urban area. In addition,
works will be built in the next years to enable the city to provide a suitable
way of living to future generations. This is a significant contribution to the
sustainable development of Mexicali urban area.
In
the area of regional planning, the project incorporates actions and tasks
included in the National Water Program (PNH), such as the implementation of
projects and actions intended to reduce water contamination in a watershed
considered by the PNH to be a priority area because it is a a bi-national
watershed with significant economic activity. Moreover, the project meets the
basic premises of policy guidelines proposed by the PNH, as it targets its
efforts to considering the development of the city of Mexicali within a
sustainability framework that considers water as a national security resource
and incorporates public participation in decision making processes, inasmuch as
they are the ones ultimately affected by the implementation of water related
policies.
4.
Natural Resource Conservation
With
the proposed improvements for the wastewater treatment system, wastewater from
the sewer system will reach a higher quality level before reaching its final
disposal in water bodies, creating safer sanitary conditions for the community.
With the project implementation, it will be reduced considerably the raw
wastewater contribution to the New River bi-national watershed, therefore, the
organic load and nutrients contribution to the Salton Sea will be reduced.
Potentially it will contribute to mitigate this water body current
eutrophication levels.
5. Community Development
Results obtained from the implementation of the Mexicali Project, in addition to improving the quality of water and the environment, will create favorable conditions for the city's development, starting with the creation of new jobs for the construction, operation and maintenance of the proposed projects. In addition, the community will be provided with wastewater treatment infrastructure, which will be expanded according to a planned development, in order to avoid future lack of capacity.