Molzen-Corbin & Associates (MCA) has prepared a draft Preliminary Engineering Report (PER) for the AWSD (September 2015) to evaluate alternatives to expand the water distribution system and replace aging infrastructure. The action alternatives considered in the PER vary by alignment corridors to accommodate the expansion, river crossing technologies to be implemented, and sizes of waterline to be installed.