- Reduction of fuel consumption; Reduction of gas discharge to the atmosphere; Reduction of require illumination in avenues; Reduction of energy required for the extraction, production, transportation and maintenance of roads; by road repaving
Total Project Cost | US 125.46M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 102.04M - NADBank Loan |