The purpose of the Project is to provide access to and use of first-time wastewater services in unserved areas, eliminate exposure to untreated or inadequately treated wastewater discharges, and provide adequate wastewater treatment capacity contributing to the reduction of water pollution and the risk of waterborne disease.
The Project is expected to generate environmental and human health benefits related to the following outcomes:
Provide access to wastewater collection services for 342 existing homes, including the installation of household wastewater connections to 100% of the existing homes in the Project area.
Eliminate untreated or inadequately treated wastewater discharges of approximately 0.096 million gallons per day (mgd).
Improve wastewater treatment service for 100% of the system’s wastewater connections.
Total Project Cost | US 16.34M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 7.48M - NADBank Grant: BEIF |