The project consists of expanding the sanitary sewage system, the installation of electromechanical equipment at the existing South Lift Station, construction of a pressurized wastewater forcemain, and the construction of the third module for the Wastewater Treatment Plant, including the construction of the infiltration lagoons for final disposal of the effluent.
Total Project Cost | US 15.2M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 1.58M - NADBank Loan US 6.08M - NADBank Grant: BEIF |