Given the significant lack of paving coverage in the city of Playas de Rosarito, the Project proposal utilize funds to increase paving coverage and continue to achieve of reducing PM10 emissions. The Project achieved the expected objectives of improved access to adequate road infrastructure and improved air quality by helping to reduce emissions by new paving roads in several residential areas of Playas de Rosarito that lacked this infrastructure. This Project helped to meet paving deficiencies. The paving works helped local resident, directly, by improving their mobility in the city.
The objective of the Project was to improve access to adequate road infrastructure, thus reducing harmful emissions and contributing to an improvement in air quality and human health to provide; reduction of harmful emissions, access to paved roads, and Improvements to the water and wastewater system.
The implemented Project consisted of first time road paving for an area of 700,000 m² in several residential areas, included; development of final designs, new paving, equipment acquisition, supervision and repair and Improvements to the water and wastewater system.
Total Project Cost | US 21.17M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 17.11M - NADBank Loan |