Expansion of the wastewater collection system and construction of an additional treatment module in the Porfirio Parra Wastewater Treatment Plant.
Total Project Cost | US 2.08M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 0.88M - NADBank Grant: BEIF |