The project consists of the rehabilitation of the wastewater collection system in the downtown area and the construction of a lift station in Miguel Aleman, Tamaulipas.
The purpose of the project is to eliminate exposure to untreated wastewater discharges by rehabilitating the wastewater collection system in the city's downtown area, including the construction of a lift station, and the construction of a force main to the wastewater treatment plant, contributing to the reduction of pollution and the risk of waterborne diseases and natural resource contamination.
Total Project Cost | US 6.26M | ||||
---|---|---|---|---|---|
NADBank Funding |
US 1.39M - NADBank Grant: BEIF |