Santa Teresa Solar + Storage Project in Doña Ana County, New Mexico

The purpose of the Project is to increase the installed capacity of solar and energy storage, which will reduce future demand on fossil fuel-based energy production and allow the system operator to manage the grid more efficiently and reduce the use of ramp-up/ramp-down fossil-fuel power generating plants.  The Project will displace harmful emissions, as well as assure the optimum use of electricity from renewable energy sources integrated in the grid.

Comments regarding the proposal must be received by February 12, 2025.

 

How To Comment

Comments regarding the proposal can be sent to the following addresses:

EMAIL
candidateprojects@nadb.org

FAX
U.S - (915) 975-8280
Mexico - 011 [52] 656-625-6999

MAIL

Mexico
Blvd. Tomás Fernández 8069
Cd. Juárez, Chihuahua, 32440

USA
P.O. Box 220718
El Paso, Texas 79913