Develop a predictive hydrologic model to determine peak discharges and runoff volumes and a hydraulic model to assess the conveyance capacity of the existing channels, washes and storm drain infrastructure. These results will be used to formulate flood hazard mitigation alternatives that have the biggest impact in reducing flood hazards for each community.
Total Project Cost | US 258,717.80 | ||||
---|---|---|---|---|---|
NADBank Funding | $192,000 | ||||
Other Funding Partners |
Binational Technical Committee (BTC) |